Today seems to be a lot of work for the contractors. 1. Installation of Aluminium bi-fold doors to both toilets. 2. Reinstate electrical works. 3. Painting the ceiling and pipes. 4. Install grab bar for both toilets. 5. Remove the mobile toilet. 6. Install the remaining toiletware such mirror, instant heaters, bidet spray, water taps etc. aluminium bi-fold doorsmaster bedroom toiletkitchen toiletFinally we got chance to bathe today. Alhamdulillah for everything. Posted By: